
All vehicle and train traffic on the Öresund Bridge was stopped in both directions at 6:30 p.m.
– The reason is that we cannot control the technical systems, said press contact Helene Rosdahl to TT.
This meant that, among other things, the monitoring system in the tunnel was out of service. At 7:40 p.m., train traffic resumed and at 8:30 p.m., the bridge was also opened to vehicle traffic.
Source: TT








