Thursday 27 Aug, 2026

Öresund Bridge reopens after technical failure

Remove

All vehicle and train traffic on the Öresund Bridge was stopped in both directions at 6:30 p.m.

– The reason is that we cannot control the technical systems, said press contact Helene Rosdahl to TT.

This meant that, among other things, the monitoring system in the tunnel was out of service. At 7:40 p.m., train traffic resumed and at 8:30 p.m., the bridge was also opened to vehicle traffic.

Source: TT

Remove

Related posts

After several years of rapid growth, tourism in Iceland appears to have stabilized around...
Interest in WTM London 2026 is already high several months before the fair. The organizer states that...
Monaco is one of the world's smallest countries, but it contains an unusually large mix of history,...
Sunsets, long dinners and an escape from the hustle and bustle of everyday life. A vacation can do more for your relationship...

Popular posts

Our website uses cookies. Read more about our use of cookies: Privacy policy